Originally, the Jai Hind metro station was prepared to generally be elevated. Nevertheless, the AAI objected the elevated extend up to the airport may well pose a menace to plane, so the route was further reworked along with the station was shifted underground, a hundred and fifty m through the Airport https://brookshjqvv.liberty-blog.com/32195070/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf