Option: The load path must be accounted for from the middle of gravity with the unit for the structure. Answer: All connections from the unit in the restrained spring isolators the has to be made for these hundreds. For concrete attachments, this needs ICC-ES certified anchors. b) We may need, https://juliusigbxt.get-blogging.com/29210926/spring-isolators-ceiling-rated-options